From Nob Hill Road to Pine Island Road
- Continue drainage installation along eastbound S.R. 84
- Crews will continue to place “bulkhead”, or retaining wall, along the North New River Canal, parallel to westbound S.R. 84
- Concrete barrier wall will be placed along the center median of I-595
Pine Island Road Intersection
- Continue installing foundation for the I-595 overpass bridge at Pine Island Road
- Concrete barrier wall will be placed along the center median of I-595
|
From Pine Island Road to University Drive
- Crews will place material to raise median to the same height as the roadway
- Placing temporary pavement on westbound S.R. 84 to widen the roadway
- Concrete barrier wall will be placed along the center median of I-595
From University Drive to Davie Road
- Concrete barrier wall will be placed along the center median of I-595
- Clearing along the North New River Canal will continue
|