New River Greenway

Greenway Advanced Construction Photos

Click on an image below to view an enlarged version

June 2009
Clearing and grubbing operations with temporary orange fencing north of the proposed path, and silt fence on both sides of the path.
Clearing and grubbing being performed west of Commodore Drive, looking west. Silt fence is installed on both sides of the proposed path.
   
Looking east at 125th Avenue Bridge at silt fence being installed on both sides of the path. Trenching for the silt fence on the north bank, parallel with the canal.
   
Picture looking west from the west side of Commodore at limerock placement on the proposed path, showing compaction effort.
Documentation of the second Density Machine used for gauge comparison.