New River Greenway

Greenway Advanced Construction Photos

Click on an image below to view an enlarged version

March 2010
Greenway Advance Construction Photo Greenway Advance Construction Photo
Bridge 203 being delivered via the OPWCD entrance.
Turbidity barrier view from the sidewalk on Pine Island Road.
   
Greenway Advance Construction Photo Greenway Advance Construction Photo
Bridge 203 being backed into the staging area.
Fabric Form Rip Rap on Western slope and Bridge 203 in view.
   
Greenway Advance Construction Photo Greenway Advance Construction Photo
Anzac and Dragados meeting prior to the installation of the pedestrian bridge.
Anzac checking alignment to mark the anchor bolt locations.
   
Greenway Advance Construction Photo Greenway Advance Construction Photo
Anzac drilling the holes for the anchor bolts.
Bridge being moved into place for installation.
   
Greenway Advance Construction Photo Greenway Advance Construction Photo
Bridge being placed.
Finalizing placement of the pedestrian bridge, looking west.